Government scheme · EII / Supercharger

The British Industry Supercharger and EII exemption, explained

The Energy Intensive Industries (EII) exemption, now packaged as the British Industry Supercharger, is the richest electricity relief available to UK manufacturers. If your business holds an EII certificate, you shouldn't be paying most government levies on your power bill. Many eligible plants still are.

Get your free energy review

No login needed · Report in 5 minutes

  • Full exemption from the indirect costs of RO, FiT, CfD and Capacity Market
  • Up to 90% compensation on network charges (TNUoS, DUoS, BSUoS)
  • Worth roughly £65–£87 per MWh in total, according to government
  • Eligibility is tested at sector and business level
  • Relief is shown on an EII certificate and applied by your supplier
  • Plants that don't qualify may get BICS instead, with a lower bar

What the Supercharger removes from your bill

Eligible energy-intensive businesses get a full exemption from the indirect costs of four policy schemes that suppliers normally pass through:

  • Renewables Obligation (RO)
  • Feed-in Tariffs (FiT)
  • Contracts for Difference (CfD)
  • Capacity Market (CM)

On top of that, the Supercharger pays up to 90% compensation on network charges such as TNUoS, DUoS and BSUoS. The government puts total support at roughly £65 to £87 per MWh. For a plant using 5 GWh a year, that can be worth several hundred thousand pounds annually.

Who qualifies for EII relief?

Eligibility works at two levels. Your sector must be on the eligible EII list, defined by SIC code and based on electricity and trade intensity. Your business must then pass its own electricity-intensity test, comparing your electricity costs with your gross value added (GVA). Typical eligible sectors include steel and metals, chemicals, paper, glass, ceramics, cement and some food and plastics processes.

If you clear both tests, you get an EII certificate showing the percentage of each meter that's exempt. Your supplier applies the exemption from that certificate.

Why eligible plants still overpay

We regularly see three problems on EII-certified sites:

  1. The supplier hasn't applied the certificate to every MPAN, or applied it at the wrong percentage.
  2. The certificate is out of date after a change in site, meter or production mix.
  3. Network charge compensation hasn't been claimed, even though it's a separate process from the levy exemption.

A bill review against your certificate usually spots these within minutes.

EII vs BICS: which applies to you?

BICS (the British Industrial Competitiveness Scheme) opens similar relief to a much wider group of manufacturers from April 2027. It covers RO, FiT and Capacity Market, but not CfD or network charges, so it's worth up to about £40/MWh. If you already hold an EII certificate, the Supercharger is the better deal. You can apply for BICS too, but only for electricity not already covered by your EII certificate. If you never qualified for EII, BICS is likely your route in, and the application window closes on 30 November 2026.

Frequently asked questions

See your annual savings in the next five minutes

No login, no obligation. Just a clear, AI-built report and a callback from a consultant who knows your sector.

Start my free audit