Cost lever · Non-commodity costs

DUoS, TNUoS and other non-commodity charges, explained for manufacturers

The wholesale price of power is often less than half of what a manufacturer pays per unit. The rest is non-commodity costs: network charges, balancing costs and government levies. They're harder to read on a bill, easier to get wrong, and several can be reduced or recovered.

Get your free energy review

No login needed · Report in 5 minutes

  • Non-commodity costs are often 50% or more of an industrial electricity bill
  • DUoS covers the local network, with red, amber and green time bands
  • TNUoS covers the national transmission network
  • BSUoS covers balancing the grid in real time
  • Policy levies (RO, FiT, CfD, CM) can be cut through BICS or EII relief
  • Billing errors on these lines are common and can often be reclaimed

What's on a typical industrial electricity bill

| Charge | What it pays for | Can you influence it? | |---|---|---| | Wholesale energy | The power itself | Yes, through timing and purchasing strategy | | DUoS | Local distribution network | Yes, through load shifting and capacity | | TNUoS | National transmission network | Partly, through charging band and Triad avoidance | | BSUoS | Balancing the grid | Limited | | RO, FiT, CfD, CM | Government policy schemes | Yes, through BICS or EII exemptions | | CCL | Climate Change Levy | Yes, through a CCA |

DUoS: red, amber and green bands

DUoS unit rates change by time of day. The red band, usually weekday late afternoons and early evenings, can cost many times more per kWh than green. Plants that can move flexible loads out of red, such as batch processes, charging, compressors or pre-cooling, often save significantly without reducing output. Fixed DUoS charges, including capacity (kVA), sit alongside the unit rates.

TNUoS and Triads

Since the Targeted Charging Review, most TNUoS is recovered through fixed daily charges set by your site's charging band, based on voltage and capacity or consumption. Check your band is correct, because a misallocated site can overpay for years. Half-hourly sites also pay a locational element linked to demand during the three winter peak periods known as Triads. Reducing load during likely Triad periods still has value for some plants.

Policy levies: the biggest cut for many manufacturers

The Renewables Obligation, Feed-in Tariffs, Contracts for Difference and Capacity Market are passed through on almost every business bill. Eligible manufacturers can now be exempted:

  • EII / British Industry Supercharger covers all four, plus network charge compensation.
  • BICS covers RO, FiT and CM from April 2027, worth up to £40/MWh. Applications close on 30 November 2026.

Checking non-commodity charges for errors

Common mistakes include the wrong DUoS tariff or line loss factor, an incorrect TNUoS charging band, excess capacity charged in error, and exemptions not applied to every meter. Because these are pass-through costs, suppliers will usually correct and refund them once the error is evidenced.

Frequently asked questions

See your annual savings in the next five minutes

No login, no obligation. Just a clear, AI-built report and a callback from a consultant who knows your sector.